tower crane dismantling method statement

Tower Crane Dismantling Method Statement Jun 2026

A method statement must include detailed emergency response procedures.

A detailed map showing the crane's position relative to the building, power lines, and public access areas.

A dedicated rescue kit (including a suspension trauma relief strap and descender rescue system) must be on-site, with a trained rescue team ready to retrieve an incapacitated worker from the mast. tower crane dismantling method statement

Contact numbers for emergency services must be posted at the site entrance and known to all personnel.

Undo the high-tensile structural bolts or pins fixing the slewing assembly to the top mast section. A method statement must include detailed emergency response

With the jib removed, the remaining counterweights and the counter-jib assembly can be dismantled. This section typically contains the hoist machinery and electrical equipment.

Attach the rigging lines of the assist crane to the designated lifting points of the counter-jib. Take up the load tension. Contact numbers for emergency services must be posted

| Role | Responsibility | |------|----------------| | Appointed Person (AP) | Overall planning, risk assessment, method statement approval, lifting plan sign-off. | | Crane Supervisor | Supervise dismantling activities, ensure lift plan followed, stop unsafe acts. | | Tower Crane Operator (during dismantling) | Operate crane for last lifts if powered, then vacate cabin safely. | | Mobile Crane Operator | Operate assist crane for lowering mast sections, jib, counter-jib, slew unit. | | Riggers / Slinger Signallers | Attach slings, guide loads, communicate with crane operators. | | Ground Support Team | Receive and lay down components, secure against rolling. | | Safety Officer | Monitor compliance with PPE, exclusion zones, and permit-to-work. |

Step 5.8: Mast Section Dismantling (De-telescoping or Uncoupling)

Disconnect the upper tie rods or pendant bars connecting the jib to the A-frame/tower head.

Heavy-duty steel or timber mats to distribute the mobile crane’s load on the ground. Rigging & Hand Tools